{"id":275242,"date":"2026-06-24T16:23:22","date_gmt":"2026-06-24T12:23:22","guid":{"rendered":"https:\/\/armbanks.am\/?p=275242"},"modified":"2026-06-24T16:24:23","modified_gmt":"2026-06-24T12:24:23","slug":"a-5-mw-solar-power-plant-was-built-in-the-village-of-lanjar-with-the-assistance-of-acba-leasing","status":"publish","type":"post","link":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/","title":{"rendered":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>YEREVAN, June 24. \/ARKA\/.<\/strong> Lanjar Energy&#8217;s 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This project was designed and implemented in accordance with international engineering and safety standards, ensuring the plant&#8217;s reliability, high productivity, and long-term, uninterrupted operation. The plant has been in operation for one year, and the generated electricity is sold on the liberalized market at a daily rate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Landja Energy&#8217;s partner is Acba Leasing, a leading leasing company, which supported the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;When creating the plant, we were committed to ensuring that it would not only be profitable but also beneficial for our country.&#8221; &#8220;Acba Leasing became our partner in the construction of our power plants. In a very short period of time, we approved all the projects and have already begun construction. During construction, we encountered many obstacles, which were quickly resolved thanks to Acba Leasing,&#8221; noted Artem Karapetyan, Director of Lanjar Energy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lanjar Energy&#8217;s goal is to shape a greener, more efficient, and technologically advanced energy future for the country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Twenty-five families currently live in the village of Lanjar, and the company will annually donate a portion of its profits to them for improvements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Acba Bank is a 100% shareholder of Acba Leasing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Acba Leasing is controlled by the Central Bank of the Republic of Armenia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more information, watch the video:\\<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"youtube-embed\" data-video_id=\"8ag3xJZaGTI\"><iframe loading=\"lazy\" title=\"\u053c\u0561\u0576\u057b\u0561\u057c \u0563\u0575\u0578\u0582\u0572\u0578\u0582\u0574 \u056f\u0561\u057c\u0578\u0582\u0581\u057e\u0565\u056c \u0567 5 \u0574\u054e\u057f \u0570\u0566\u0578\u0580\u0578\u0582\u0569\u0575\u0561\u0574\u0562 \u0561\u0580\u0587\u0561\u0575\u056b\u0576 \u056f\u0561\u0575\u0561\u0576\" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/8ag3xJZaGTI?feature=oembed&#038;enablejsapi=1\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Lanjar Energy&#8217;s 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.<\/p>\n","protected":false},"author":5,"featured_media":275229,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","tstyn_error":""},"categories":[12315,12202,9216],"tags":[15853,12753],"class_list":["post-275242","post","type-post","status-publish","format-standard","has-post-thumbnail","category-announces","category-loan-organizations","category-news","tag-acba-2","tag-energy"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Lanjar Energy&#039;s 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"engeditor\"\/>\n\t<meta name=\"google-site-verification\" content=\"l8sdBd3STQ6A37MF5AO_21FEwNPHg9tRpooOo3Wx_eQ\" \/>\n\t<meta name=\"keywords\" content=\"acba,energy\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing - ArmBanks.am\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Lanjar Energy&#039;s 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/armbanks.am\/wp-content\/uploads\/2026\/06\/MyCollages-2026-06-24T153205.898.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#blogposting\",\"name\":\"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing - ArmBanks.am\",\"headline\":\"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing\",\"author\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/author\\\/engeditor\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/armbanks.am\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/MyCollages-2026-06-24T153205.898.jpg\",\"width\":974,\"height\":668,\"caption\":\"\\u0410\\u043a\\u0431\\u0430\"},\"datePublished\":\"2026-06-24T16:23:22+04:00\",\"dateModified\":\"2026-06-24T16:24:23+04:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#webpage\"},\"articleSection\":\"Announces, Loans, News, ACBA, ENERGY\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/armbanks.am\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/category\\\/news\\\/#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/armbanks.am\\\/en\\\/category\\\/news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#listItem\",\"name\":\"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#listItem\",\"position\":3,\"name\":\"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/#organization\",\"name\":\"ArmBanks.am\",\"description\":\"ArmBanks.am - \\u0424\\u0438\\u043d\\u0430\\u043d\\u0441\\u043e\\u0432\\u043e-\\u0431\\u0430\\u043d\\u043a\\u043e\\u0432\\u0441\\u043a\\u0438\\u0439 \\u043f\\u043e\\u0440\\u0442\\u0430\\u043b \\u0430\\u0433\\u0435\\u043d\\u0442\\u0441\\u0442\\u0432\\u0430 \\u00ab\\u0410\\u0420\\u041a\\u0410\\u00bb | \\u0411\\u0430\\u043d\\u043a\\u0438, \\u043a\\u0440\\u0435\\u0434\\u0438\\u0442\\u043d\\u044b\\u0435 \\u043e\\u0440\\u0433\\u0430\\u043d\\u0438\\u0437\\u0430\\u0446\\u0438\\u0438, \\u0441\\u0442\\u0440\\u0430\\u0445\\u043e\\u0432\\u043e\\u0439 \\u0438 \\u0432\\u0430\\u043b\\u044e\\u0442\\u043d\\u044b\\u0439 \\u0440\\u044b\\u043d\\u043e\\u043a, \\u044d\\u043a\\u043e\\u043d\\u043e\\u043c\\u0438\\u043a\\u0430, \\u0440\\u0435\\u0439\\u0442\\u0438\\u043d\\u0433\\u0438, \\u0433\\u043e\\u043b\\u043e\\u0441\\u043e\\u0432\\u0430\\u043d\\u0438\\u044f, \\u043e\\u043d\\u043b\\u0430\\u0439\\u043d-\\u043a\\u043e\\u043d\\u0441\\u0443\\u043b\\u044c\\u0442\\u0430\\u043d\\u0442\",\"url\":\"https:\\\/\\\/armbanks.am\\\/en\\\/\",\"telephone\":\"+37410524080\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/armbanks.am\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/android-chrome-144x144-1.png\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#organizationLogo\",\"width\":144,\"height\":144},\"image\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ArmBanks.am\",\"https:\\\/\\\/www.youtube.com\\\/@ARKANEWS#\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/arka-news-agency\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/author\\\/engeditor\\\/#author\",\"url\":\"https:\\\/\\\/armbanks.am\\\/en\\\/author\\\/engeditor\\\/\",\"name\":\"engeditor\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/566b2eeecd04c137f908e0d3e054236ef144186cea5ed1e22289fe5648681a4b?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"engeditor\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#webpage\",\"url\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/\",\"name\":\"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing - ArmBanks.am\",\"description\":\"Lanjar Energy's 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/author\\\/engeditor\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/author\\\/engeditor\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/armbanks.am\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/MyCollages-2026-06-24T153205.898.jpg\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#mainImage\",\"width\":974,\"height\":668,\"caption\":\"\\u0410\\u043a\\u0431\\u0430\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/2026\\\/06\\\/24\\\/275242\\\/#mainImage\"},\"datePublished\":\"2026-06-24T16:23:22+04:00\",\"dateModified\":\"2026-06-24T16:24:23+04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/armbanks.am\\\/en\\\/\",\"name\":\"ArmBanks.am\",\"description\":\"Armenian financial-banking portal\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/armbanks.am\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing - ArmBanks.am","description":"Lanjar Energy's 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.","canonical_url":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/","robots":"max-image-preview:large","keywords":"acba,energy","webmasterTools":{"google-site-verification":"l8sdBd3STQ6A37MF5AO_21FEwNPHg9tRpooOo3Wx_eQ","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#blogposting","name":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing - ArmBanks.am","headline":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing","author":{"@id":"https:\/\/armbanks.am\/en\/author\/engeditor\/#author"},"publisher":{"@id":"https:\/\/armbanks.am\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/armbanks.am\/wp-content\/uploads\/2026\/06\/MyCollages-2026-06-24T153205.898.jpg","width":974,"height":668,"caption":"\u0410\u043a\u0431\u0430"},"datePublished":"2026-06-24T16:23:22+04:00","dateModified":"2026-06-24T16:24:23+04:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#webpage"},"isPartOf":{"@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#webpage"},"articleSection":"Announces, Loans, News, ACBA, ENERGY"},{"@type":"BreadcrumbList","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/armbanks.am\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/armbanks.am\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/armbanks.am\/en\/category\/news\/#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/armbanks.am\/en\/category\/news\/#listItem","position":2,"name":"News","item":"https:\/\/armbanks.am\/en\/category\/news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#listItem","name":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing"},"previousItem":{"@type":"ListItem","@id":"https:\/\/armbanks.am\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#listItem","position":3,"name":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing","previousItem":{"@type":"ListItem","@id":"https:\/\/armbanks.am\/en\/category\/news\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/armbanks.am\/en\/#organization","name":"ArmBanks.am","description":"ArmBanks.am - \u0424\u0438\u043d\u0430\u043d\u0441\u043e\u0432\u043e-\u0431\u0430\u043d\u043a\u043e\u0432\u0441\u043a\u0438\u0439 \u043f\u043e\u0440\u0442\u0430\u043b \u0430\u0433\u0435\u043d\u0442\u0441\u0442\u0432\u0430 \u00ab\u0410\u0420\u041a\u0410\u00bb | \u0411\u0430\u043d\u043a\u0438, \u043a\u0440\u0435\u0434\u0438\u0442\u043d\u044b\u0435 \u043e\u0440\u0433\u0430\u043d\u0438\u0437\u0430\u0446\u0438\u0438, \u0441\u0442\u0440\u0430\u0445\u043e\u0432\u043e\u0439 \u0438 \u0432\u0430\u043b\u044e\u0442\u043d\u044b\u0439 \u0440\u044b\u043d\u043e\u043a, \u044d\u043a\u043e\u043d\u043e\u043c\u0438\u043a\u0430, \u0440\u0435\u0439\u0442\u0438\u043d\u0433\u0438, \u0433\u043e\u043b\u043e\u0441\u043e\u0432\u0430\u043d\u0438\u044f, \u043e\u043d\u043b\u0430\u0439\u043d-\u043a\u043e\u043d\u0441\u0443\u043b\u044c\u0442\u0430\u043d\u0442","url":"https:\/\/armbanks.am\/en\/","telephone":"+37410524080","logo":{"@type":"ImageObject","url":"https:\/\/armbanks.am\/wp-content\/uploads\/2025\/01\/android-chrome-144x144-1.png","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#organizationLogo","width":144,"height":144},"image":{"@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/ArmBanks.am","https:\/\/www.youtube.com\/@ARKANEWS#","https:\/\/www.linkedin.com\/company\/arka-news-agency\/"]},{"@type":"Person","@id":"https:\/\/armbanks.am\/en\/author\/engeditor\/#author","url":"https:\/\/armbanks.am\/en\/author\/engeditor\/","name":"engeditor","image":{"@type":"ImageObject","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/566b2eeecd04c137f908e0d3e054236ef144186cea5ed1e22289fe5648681a4b?s=96&d=mm&r=g","width":96,"height":96,"caption":"engeditor"}},{"@type":"WebPage","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#webpage","url":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/","name":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing - ArmBanks.am","description":"Lanjar Energy's 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/armbanks.am\/en\/#website"},"breadcrumb":{"@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#breadcrumblist"},"author":{"@id":"https:\/\/armbanks.am\/en\/author\/engeditor\/#author"},"creator":{"@id":"https:\/\/armbanks.am\/en\/author\/engeditor\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/armbanks.am\/wp-content\/uploads\/2026\/06\/MyCollages-2026-06-24T153205.898.jpg","@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#mainImage","width":974,"height":668,"caption":"\u0410\u043a\u0431\u0430"},"primaryImageOfPage":{"@id":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/#mainImage"},"datePublished":"2026-06-24T16:23:22+04:00","dateModified":"2026-06-24T16:24:23+04:00"},{"@type":"WebSite","@id":"https:\/\/armbanks.am\/en\/#website","url":"https:\/\/armbanks.am\/en\/","name":"ArmBanks.am","description":"Armenian financial-banking portal","inLanguage":"en-US","publisher":{"@id":"https:\/\/armbanks.am\/en\/#organization"}}]},"twitter:card":"summary_large_image","twitter:title":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing - ArmBanks.am","twitter:description":"Lanjar Energy's 5 MW solar power plant with a capacity of 9 million kWh is located in the village of Lanjar in the Ararat region.","twitter:image":"https:\/\/armbanks.am\/wp-content\/uploads\/2026\/06\/MyCollages-2026-06-24T153205.898.jpg"},"aioseo_meta_data":{"post_id":"275242","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-06-24 12:23:24","updated":"2026-06-24 13:18:22","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/armbanks.am\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/armbanks.am\/en\/category\/news\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tA 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/armbanks.am\/en\/"},{"label":"News","link":"https:\/\/armbanks.am\/en\/category\/news\/"},{"label":"A 5 MW solar power plant was built in the village of Lanjar with the assistance of Acba Leasing","link":"https:\/\/armbanks.am\/en\/2026\/06\/24\/275242\/"}],"_links":{"self":[{"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/posts\/275242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/comments?post=275242"}],"version-history":[{"count":2,"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/posts\/275242\/revisions"}],"predecessor-version":[{"id":275247,"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/posts\/275242\/revisions\/275247"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/media\/275229"}],"wp:attachment":[{"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/media?parent=275242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/categories?post=275242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/armbanks.am\/en\/wp-json\/wp\/v2\/tags?post=275242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}